11月工事進捗状況レポート

11月は基礎・ピット(地下2階の下の部分)の躯体工事を行っております。

November Progress Report on Taki Plaza Construction

For the month of November, a two-floor open pit was created and a structural frame was constructed (the part underneath the second level basement).

photo 百年記念館から撮影した写真。/Aerial shot taken from Centennial Hall.

photo 定点観測写真11月分/Fixed-point observation in November 2019